Skip to Main Content
iTwin Ideas Portal
ADD A NEW IDEA

Ideas

Grid control content within forms export to CSV/Excel format

Specifically, the grid control content within forms is not supported for export to CSV/Excel format Thank you for submitting an idea. Please provide the problem, user needs and high-level requirements, any screenshot or recording that may help our...
Guest about 1 month ago in iTwin Ideas Portal (iT-3 & 5) / iTwin Hub 0

Please make "Measure Location" tool to at least 3 decimal places so that RLs can be read in mm.

Idea template Thank you for submitting an idea. Please provide the problem, user needs and high-level requirements, any screenshot or recording that may help our team understand this. Problem to solve: User needs: High-level requirements: ...
Guest 10 days ago in iTwin Ideas Portal (iT-3 & 5) / Design review 0

Imperial dimensions should also be available in feet and fractional inches, not just decimal feet

iTwin only offers decimal feet for measurements. Most engineering dimensions in imperial are feet and inches and fractional inches. Not including this option requires the user to perform conversion calculations to be able to check against drawings...
Guest over 3 years ago in iTwin Ideas Portal (iT-3 & 5) / Design review 4

Data Visualization for ProjectWise in iModel viewer

With the addition of projectwise properties inside an iModel under the select * from bis.repositorylink. Can these be made available in the dataviz so we can colour code by suitability etc.
Glen Worrall almost 5 years ago in iTwin Ideas Portal (iT-3 & 5) / Design review 0

Ability for admin to add custom warning to Design Review

It would be useful to be able to add a admin custom warning which pops up on Design Review when opening an iModel. This could be a caveat or something useful you want the user to know. Perhaps limitations of the iModel for example.
Guest over 1 year ago in iTwin Ideas Portal (iT-3 & 5) / Design review 0

Could you support a batch export so multiple clash CSV files are exported together in one operation instead of one at a time?

We have potentially hundreds of clash rules, and exporting the results to csv as a record, which can also be turned into pivot tables, is very useful. However the export button does each one separately, one after the other. This is slow and tediou...
Guest about 1 month ago in iTwin Ideas Portal (iT-3 & 5) / Applications / Services 0

Notification on synchronization failure

It would be useful to be able to set up a notification (email or other) when a synchronization job from the iTwin Synchronizer portal fails. This way a project admin would now when failures occurred and need to be corrected.
Guest almost 6 years ago in iTwin Ideas Portal (iT-3 & 5) / Portal 5 Planned

More optimized ifc export file size exports

More optimized IFC exports which use type instancing and other optimizations would greatly reduce file size and increase usability of the IFCs exported out of the i-twin engine.
Guest 10 months ago in iTwin Ideas Portal (iT-3 & 5) / iTwin Hub 0

Feature that allow us to revert to a previous iModel state

We need a feature that allow us to revert to a previous iModel state, if the change was unintended and was pushed to iModelBank. The features would remove the unintended change, including all following changes, and Named Versions created on change...
Guest over 5 years ago in iTwin Ideas Portal (iT-3 & 5) / iModel management 1 Future consideration

Color coded issues

Problem Please bring back the color coded markers based on the status as it was before in Connect see image. As a user of the iModel Viewer, it would be helpful to have the Forms and to visually see the workflow status by colour coding the Form Ma...
Guest about 2 years ago in iTwin Ideas Portal (iT-3 & 5) / Design review 1 Likely to implement