Skip to Main Content
iTwin Ideas Portal
ADD A NEW IDEA

Portal

Showing 27

Notification on synchronization failure

It would be useful to be able to set up a notification (email or other) when a synchronization job from the iTwin Synchronizer portal fails. This way a project admin would now when failures occurred and need to be corrected.
Guest over 4 years ago in Portal 5 Planned

Sync interruption

In cases we have had a last minute revision of one of the reference models if would be nice to be able to cancel or interrup existing synchronization job and do not wait until the previous one ends to start a new one. Last minute changes are very ...
Guest over 4 years ago in Portal 3 Future consideration

Revision and Suitability Metadata fields

When mapping .idgn's to a master i.model there will be instances where the i.dgn will be revised over a period of time, each time with a difference revision (P01 - P02 etc). Currently the only way to capture this information within the imodel.hub ...
Guest over 5 years ago in iModel management / Portal 3 Future consideration

Sync from BIM 360

Allow data mapping and synchronizations from BIM 360
Laisvune Valackaite about 4 years ago in iTwin synchronization / Portal 3 Future consideration

Drop-down list of versions while creating iModel

While we create iModel and open folder with models directly from Project Wise all versions appear. It would be better if only last version would be chosen by default with a possibility to choose verion from drop-down list in version column
Guest about 1 year ago in Portal 0

Utilise Saved Searches to filter models by Suitability

It is very important that apart from having the option to look into the PW folders also use the saved searches to Synchronise the model to a specific set of search definitions. This option is essential to properly manage the status of the synchron...
Guest over 4 years ago in Portal 0 Future consideration

Automatic Named view creation after Scheduled Synchronisation

When setting up scheduled synchronization for a connection in the iTwin Synchronization Portal, it would be good to be able to automate the creation of a named version when the job completes. At present we have to do this manually before the team ...
Guest over 4 years ago in Portal 0

Pull references from a Revit masterfile

Add ability for the Bentley iModel Connector for Revit to pull references from a Revit masterfile, to avoid having to manually add all of the referenced files to the connection.
Guest over 1 year ago in Portal 1

Ability to simultaneously synchronize the same file in multiple iModels

I am finding that the Bridging process fails when multiple iModels are syncing to the same file in ProjectWise when using ProjectWise Connections. There are many instances where the same blank spatial root may be used for example or a common file ...
Guest about 4 years ago in iTwin synchronization / Portal 0 Future consideration

iTwin Connections - Add more columns/details to show additional source file details

Is it possible to get more columns in the iTwin connection portal view ? At the moment all we get is Name, Description and Version, which isn’t always enough information for the creator to find the desired input/source files. Can it be enhanced to...
Guest over 3 years ago in Portal 0