Skip to Main Content
iTwin Ideas Portal
ADD A NEW IDEA

iTwin synchronization

Showing 73

Notification on synchronization failure

It would be useful to be able to set up a notification (email or other) when a synchronization job from the iTwin Synchronizer portal fails. This way a project admin would now when failures occurred and need to be corrected.
Guest about 5 years ago in iTwin Ideas Portal (iT-3 & 5) / Portal 5 Planned

Tags from MicroStation missing in iTwins

Our customers have many old MicroStation files in which Tags are used and we cannot modify these files. Now MicroStation is the underlying engine for many software applications so we would like to ensure that these files can be used without conver...

Sync interruption

In cases we have had a last minute revision of one of the reference models if would be nice to be able to cancel or interrup existing synchronization job and do not wait until the previous one ends to start a new one. Last minute changes are very ...
Guest about 5 years ago in iTwin Ideas Portal (iT-3 & 5) / Portal 3 Future consideration

creating an iTwin of approved for share files in ProjectWise

We use ProjectWise document workflow engine to support our ISO 19650 process. We want to make the federated iTwin available for all project members to visualize and review but want to ensure that only approved for shared files are synchronized to ...
Joe Granville almost 5 years ago in iTwin Ideas Portal (iT-3 & 5) / iModel management / iTwin synchronization 3 Future consideration

Cadastre documentation synchronization

The current synchronisation of iModels prevents the individual naming of the 4 files that make up the cadastre documentation. It is necessary, for quality reasons, to avoid that several documents share the same name, so the current synchronisation...
Guest about 2 months ago in iTwin Ideas Portal (iT-3 & 5) / iTwin synchronization 0

Automatically create a new named version after a daily scheduled synchronisation

Our projects we currently run a separate design coordination model from our clash model, allowing clients to see the progress of a federated model without the need to show associated clash information. We have this model set to synchronize daily, ...

Revision and Suitability Metadata fields

When mapping .idgn's to a master i.model there will be instances where the i.dgn will be revised over a period of time, each time with a difference revision (P01 - P02 etc). Currently the only way to capture this information within the imodel.hub ...
Guest about 6 years ago in iTwin Ideas Portal (iT-3 & 5) / iModel management / Portal 3 Future consideration

Add option to view which files cause "Display Optimization not available" error

There is currently no way to determine which file is disabling graphic optimization. We find this incredibly frustrating as it is a trial-and-error process to determine where/when the issue occurs. This comes with a noticeably slower graphical per...

Sync elements in a container created within iTwin

For someone who needs to sync multiple models and group them in the same container within iTwin, we must attach all the models in one DGN file. This creates two issues: Managing multiple 3D models locally can be difficult. iTwin can’t sync DGN fil...

Sync from BIM 360

Allow data mapping and synchronizations from BIM 360
Laisvune Valackaite almost 5 years ago in iTwin Ideas Portal (iT-3 & 5) / iTwin synchronization / Portal 3 Future consideration