Skip to Main Content
iTwin Ideas Portal
ADD A NEW IDEA

iTwin synchronization

Showing 12

creating an iTwin of approved for share files in ProjectWise

We use ProjectWise document workflow engine to support our ISO 19650 process. We want to make the federated iTwin available for all project members to visualize and review but want to ensure that only approved for shared files are synchronized to ...
Joe Granville about 4 years ago in iModel management / iTwin synchronization 3 Future consideration

Sync interruption

In cases we have had a last minute revision of one of the reference models if would be nice to be able to cancel or interrup existing synchronization job and do not wait until the previous one ends to start a new one. Last minute changes are very ...
Guest over 4 years ago in Portal 3 Future consideration

Revision and Suitability Metadata fields

When mapping .idgn's to a master i.model there will be instances where the i.dgn will be revised over a period of time, each time with a difference revision (P01 - P02 etc). Currently the only way to capture this information within the imodel.hub ...
Guest over 5 years ago in iModel management / Portal 3 Future consideration

Sync from BIM 360

Allow data mapping and synchronizations from BIM 360
Laisvune Valackaite about 4 years ago in iTwin synchronization / Portal 3 Future consideration

Utilise Saved Searches to filter models by Suitability

It is very important that apart from having the option to look into the PW folders also use the saved searches to Synchronise the model to a specific set of search definitions. This option is essential to properly manage the status of the synchron...
Guest over 4 years ago in Portal 0 Future consideration

Ability to simultaneously synchronize the same file in multiple iModels

I am finding that the Bridging process fails when multiple iModels are syncing to the same file in ProjectWise when using ProjectWise Connections. There are many instances where the same blank spatial root may be used for example or a common file ...
Guest about 4 years ago in iTwin synchronization / Portal 0 Future consideration

Notifications once sync completed

some notifications when the model has been processed (eg. notification email) so we don’t need to keep checking.
Guest over 4 years ago in Portal 0 Future consideration

It's extremely time consuming to select one file at a time for iTwin connection. I have a dataset with 400 files.

I think there should be a select all and select all in all pages buttons in the Connections page. Please see screenshot.
Guest over 3 years ago in Portal 1 Future consideration

Create Instant-on connections from Excel/Csv

The current process of building connections in instant-on can be very slow and error prone when selecting documents from multiple locations in ProjectWise, plus there's no visibility of previous documents selected until progressing to the next dia...
Guest almost 4 years ago in iTwin synchronization 0 Future consideration

Select all option while adding dgn files in connection

'Select all' option while adding dgn files in connection
Guest about 4 years ago in Portal 0 Future consideration