Skip to Main Content
iTwin Ideas Portal
ADD A NEW IDEA

All ideas

Showing 613 of 613

Mark up and Attach Cross Section View to Issue

Some model issues are clearly visible in the cross section view. There should be a way to capture the cross section image, mark it up and attach to the Issues raised.
Guest about 4 years ago in iTwin Ideas Portal (iT-3 & 5) / Design review 1 Future consideration

Area property required in the Design Review "Filter By" dropdown list.

Having the ablity to filter forms by Area will be of great benefit to all iTwin users, as large projects (and imodels) have many plant areas which are generally reviewed and coordinated individually. eg issues and clashes are raised and managed on...
Guest 6 months ago in iTwin Ideas Portal (iT-3 & 5) / Design review 1

measure edge

the software can identify edges (it highlights it while measuring) it would be useful to be able to measure length based on edges.
Guest over 3 years ago in iTwin Ideas Portal (iT-3 & 5) / Design review 0

Synchronisation report

be able to download the sync report via the UI or using an API or have it emailed to the administrator
Guest 12 months ago in iTwin Ideas Portal (iT-3 & 5) / iTwin Hub 0

Fit view based on model tree

Maybe there is a feature i dont know. I would like to see the parts in the model based on a selection of one or several parts in the model tree.
Guest almost 5 years ago in iTwin Ideas Portal (iT-3 & 5) / Design review 2 Planned

Support for level symbology overrides

Support for publishing with level symbology overrides in order to have color change options for review sessions short of having material application capability.
Guest over 4 years ago in iTwin Ideas Portal (iT-3 & 5) / Design review 2

Clash Detection - Suppressed clashes removed from clash result total

When running a new clash test after a model update (new version) is created and suppression rules have been introduced to eliminate 'false' clashes, the total in the clash results remains the same. This is not a true representation of the actual c...
Guest over 4 years ago in iTwin Ideas Portal (iT-3 & 5) / Design validation 1 Future consideration

Civil Report

Civil report are fundamental. Geometry report, cant and superelevation report, volume report, turnout report, ecc.... Without it vendor can only see the model
Guest almost 5 years ago in iTwin Ideas Portal (iT-3 & 5) / Applications / Services 1

Bulk importing of Data Visualization Criteria

It would be time advantageous to be able to load many criteria at once to manipulate the view to emphasize certain groupings of objects. An example of this could be Engineering Work Packages or Construction Work Packages
Guest over 3 years ago in iTwin Ideas Portal (iT-3 & 5) / Design review 0

Group issues / Clashes for Design Review sessions

Please add the possibility to reschedule, or group issues or clashes for example to use in design review sprints and the preparation of ICE meetings?
Guest over 4 years ago in iTwin Ideas Portal (iT-3 & 5) / Design validation 2