I think a final compliance checker should be very useful. In the checker, the user could combine tests and control if each test has passed or not the compliance (using red flag and green flag) and when all the flag are green the Compliance is achi...
Often the first check is related to the Pset name fields and if they have been listed. The check could allow the user to verify if the name is correct and/or all the name required are listed in the Pset. A report with the wrong elements and/or the...
Hi, i would like to get the saved views from a NWD package from Navisworks to work "Bolt on". That would make it possible to use Navisworks both for internal collaboration with ITwin, and still have a package ready to deliver to contractor.